Name (First) | Jesse |
Name (Last) | Ballard |
Jesseballard1@icloud.com | |
Company | JB racing Engineering services |
Phone | 07710698688 |
General Location | |
Address (Street Address) | 209 Weyhill Road |
Address (Address Line 2) | |
Address (City) | Andover |
Address (County / State) | England |
Address (ZIP / Postal Code) | SP10 3LJ |
Address (Country) | United Kingdom |
Job Role | Maintenance Manager, Construction Manager, Project Manager, Maintenance Engineer, Mechanical Engineer, Project Engineer, Structural Engineer, Fitter |
Management | Assets Care, Construction, Contracts, Maintenance, Operational, Project, Supervision |
Engineering Skills | Commissioning, Electrical, Maintenance, Mechanical, Operational, Planning, Project, Purchasing, Safety, Structural |
Site Labour | Fitter |
Training | Apprenticeship, Construction, Construction Design Management, HNC, Industry Experience + 3 Years, ONC, Problem Solving, Safety, Other |
Industrial Experience | Aerospace, Construction, Construction Materials, Food, Packaging, Pulp Paper, Raw Materials, Water Treatment |
Hourly Rate | |
Package Value | |
Per Package Value | |
Experience | |
Idea | Idea Development, Idea Cost Outline, Design Review |
Feasibility | Feasibility Study, Layout Development, Benefit Idenification, Disinvestment Requirements, Investment Breakdown, Basic Delivery Plan, Feasibility CapEx Assessment, Design Review |
Pre-Engineering | Pre-Engineering Study, Risk Register, Site Standards, Maintance Prevention Workshop, Reverse Engineer, Layout Development, Basic Drawings, Basic Schedules, Mechanical & Piping Technical Scope, Control & Automation Technical Scope, Utilities/Services Technical Scope, Legal Compliance, Planning Permition, Ground Survey, Benefit Validation, Investment Breakdown, Project Delivery Plan, Resource Delivery Plan, CapEx Application |
Detailed Engineering | Roles & Responibility, Work Breakdown Idenification, Project Delivery Plan, Risk Register, Process Risk Assessments, Safety Requirement Specifaction, ATEX Compliance, Fixed Guarding, Interlock Guarding, Site Standards, Process Mass Balance, Design Reviews, Building Services, Building Utilities, Building HVAC |
Purchasing | Finance Tracker, Equipment RFQs, Civil & Structural RFQs, Mechanical & Piping RFQs, Electrical RFQs, Utilities/Services RFQs, RFQs Bid Analysis, Contract Management, Raise Purchase Orders, Change Management |
Purchasing Other | |
Installation | Construction Design Management, F10 Completion, Installation Plan, Disinvestment Plan, Isolation Plan, Outage Plan, Site Supervision |
Installation Other | |
Commissoning | Commissoning Plan |
Commissioning Other | |
Handover | PUWER Assessment, Asset Care, Benefit Validation |
Handover Other | |
Availability | Part Time, Flexible, Anytime |
Duration | Work Package, 1 Month, 2 Month, 3 Month, 4 Month, 5 Month, 6 Month, 7 Month, 8 Month, 9 Month, 10 Month, 11 Month, 12 Month |
Employment | Sole Trader, Self Employed |
Travel Distance | National |
Business Requirements | Office, Hand Tools |
Software | |
General Comments |
Mozilla/5.0 (iPad; CPU OS 12_4_5 like Mac OS X) AppleWebKit/605.1.15 (KHTML, like Gecko) Version/12.1.2 Mobile/15E148 Safari/604.1