Name (First) |
JOHN-PAUL |
Name (Last) |
SANTANGELI |
Email |
moogjp@aol.com |
Company |
LAND ENERGY GIRVAN |
Phone |
07341561989 |
General Location |
|
Address (Street Address) |
111 Bentinck Drive |
Address (Address Line 2) |
|
Address (City) |
Troon |
Address (County / State) |
Scotland |
Address (ZIP / Postal Code) |
KA10 6JB |
Address (Country) |
United Kingdom |
Job Role |
Maintenance Manager, Operational Manager, Project Manager, Mechanical Engineer, Process Engineer, Project Engineer |
Management |
Assets Care, Health & Safety, Maintenance, Operational, Project, Supervision |
Engineering Skills |
Commissioning, Maintenance, Mechanical, Operational, Planning, Process, Project, Safety |
Site Labour |
|
Training |
Confined Space, Construction Design Management, Degree, Fork Lift Truck, Industry Experience + 3 Years, Problem Solving, Safety |
Industrial Experience |
Construction, Construction Materials, Distribution, Energy, Food, Raw Materials, Recycling, Warehouse & Distribution, Waste |
Hourly Rate |
|
Package Value |
|
Per Package Value |
|
Experience |
|
Idea |
Idea Development, Flow Diagram Development, Layout Development, Legal Compliance, Benefit Identification, Investment Breakdown, Idea Cost Outline, Design Review |
Feasibility |
Feasibility Study, Flow Diagram Development, Layout Development, Legal Compliance, Benefit Idenification, Investment Breakdown, Basic Delivery Plan, Feasibility CapEx Assessment, Design Review |
Pre-Engineering |
Pre-Engineering Study, Maintance Prevention Workshop, Reverse Engineer, Process Diagram Development, 3D Site Scan, Basic Drawings, Basic Schedules, Mechanical & Piping Technical Scope, Utilities/Services Technical Scope, Legal Compliance, Planning Permition, Ground Survey, Benefit Validation, Investment Breakdown, Project Delivery Plan, CapEx Application, Design Review |
Detailed Engineering |
Roles & Responibility, Work Breakdown Idenification, Project Delivery Plan, Process Diagram Development, Risk Register, ATEX Compliance, Fixed Guarding, Interlock Guarding, Site Standards, Chemical Compatabillity, Pipe Line Schedule, Instrumentation Schedule, Valve Schedule, IO Schedule, Block Cable Diagrams, Lifting Operations, Design Reviews, Structural/Mechiical Design, Pipework Design, Building Utilities |
Purchasing |
|
Purchasing Other |
|
Installation |
Construction Design Management, F10 Completion, Installation Plan, Isolation Plan, Outage Plan, Story Boards, Site Supervision |
Installation Other |
|
Commissoning |
Commissoning Plan |
Commissioning Other |
|
Handover |
CE Mark Assessment, Compliance Assessment, Training, Asset Care, Benefit Validation |
Handover Other |
|
Availability |
Not Available |
Duration |
Work Package, 3 Month, 4 Month, 5 Month, 6 Month, 7 Month, 8 Month, 9 Month, 11 Month, 12 Month |
Employment |
PAYE |
Travel Distance |
National |
Business Requirements |
Insurance, PC / Laptop |
Software |
Microsoft 365, AutoCAD LT, AutoCAD |
General Comments |
|