Name (First) JOHN-PAUL
Name (Last) SANTANGELI
Email moogjp@aol.com
Company LAND ENERGY GIRVAN
Phone 07341561989
General Location
Address (Street Address) 111 Bentinck Drive
Address (Address Line 2)
Address (City) Troon
Address (County / State) Scotland
Address (ZIP / Postal Code) KA10 6JB
Address (Country) United Kingdom
Job Role Maintenance Manager, Operational Manager, Project Manager, Mechanical Engineer, Process Engineer, Project Engineer
Management Assets Care, Health & Safety, Maintenance, Operational, Project, Supervision
Engineering Skills Commissioning, Maintenance, Mechanical, Operational, Planning, Process, Project, Safety
Site Labour
Training Confined Space, Construction Design Management, Degree, Fork Lift Truck, Industry Experience + 3 Years, Problem Solving, Safety
Industrial Experience Construction, Construction Materials, Distribution, Energy, Food, Raw Materials, Recycling, Warehouse & Distribution, Waste
Hourly Rate
Package Value
Per Package Value
Experience
Idea Idea Development, Flow Diagram Development, Layout Development, Legal Compliance, Benefit Identification, Investment Breakdown, Idea Cost Outline, Design Review
Feasibility Feasibility Study, Flow Diagram Development, Layout Development, Legal Compliance, Benefit Idenification, Investment Breakdown, Basic Delivery Plan, Feasibility CapEx Assessment, Design Review
Pre-Engineering Pre-Engineering Study, Maintance Prevention Workshop, Reverse Engineer, Process Diagram Development, 3D Site Scan, Basic Drawings, Basic Schedules, Mechanical & Piping Technical Scope, Utilities/Services Technical Scope, Legal Compliance, Planning Permition, Ground Survey, Benefit Validation, Investment Breakdown, Project Delivery Plan, CapEx Application, Design Review
Detailed Engineering Roles & Responibility, Work Breakdown Idenification, Project Delivery Plan, Process Diagram Development, Risk Register, ATEX Compliance, Fixed Guarding, Interlock Guarding, Site Standards, Chemical Compatabillity, Pipe Line Schedule, Instrumentation Schedule, Valve Schedule, IO Schedule, Block Cable Diagrams, Lifting Operations, Design Reviews, Structural/Mechiical Design, Pipework Design, Building Utilities
Purchasing
Purchasing Other
Installation Construction Design Management, F10 Completion, Installation Plan, Isolation Plan, Outage Plan, Story Boards, Site Supervision
Installation Other
Commissoning Commissoning Plan
Commissioning Other
Handover CE Mark Assessment, Compliance Assessment, Training, Asset Care, Benefit Validation
Handover Other
Availability Not Available
Duration Work Package, 3 Month, 4 Month, 5 Month, 6 Month, 7 Month, 8 Month, 9 Month, 11 Month, 12 Month
Employment PAYE
Travel Distance National
Business Requirements Insurance, PC / Laptop
Software Microsoft 365, AutoCAD LT, AutoCAD
General Comments