
Submission Date: %datecreated%
ID:%id%
%name%
Job Role:
%jobrole%
Email: %email%
Company: %company%
Phone: %phone%
Adress:
%address%
Availability
Duration
Employment
Number of Employees
Travel Distance
Business Requirements
Software
Interested In: | General Comments | Per Hour Value | perhourvalue1 | Per Package Value | perpackagevalue1 | wdtcolumn | Idea Other | Feasibility | Feasibility Other | Pre-Engineering | Pre Engineering Other | Detailed Engineering | Detailed Engineering Other | Purchasing | Purchasing Other | Installation | Installation Other | Commissioning | Commissioning Other | Handover | Handover Other | R&D Tax Relief | Name | Company | Address | Entry Date | id |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Idea, Feasibility, R&D Tax Relief | Design Brief, Benefit Schedule & Risk Register | Basic Delivery Plan : Basic Timeline and Delivery Plan |
Agriculture, Software | anthony dyer | Harrow Harrow Middlesex HA2 6QE United Kingdom |
22/05/2020 08:33 AM | 197 | ||||||||||||||||||||
Idea, Detailed Engineering, Installation, Commissioning | Structural/Mechiical Design : Detailed Structural Design Drawings (CE & Calculations), Platform Design : Detailed Platform Design Drawings (CE & Calculations) |
Construction Design Management : Develop and Issue the Pre-Construction Health and Safety Plan, Installation Plan : Develop and Monitor the Installation Plan, Site Supervision : Deliver on site Supervision fo construction activites |
Commissoning Plan : Develop Commissioning Plan (off line & on line), including deisolation requirments |
Ben Gordon-Smith | Westwell Developments Limited | Whitewall Road Rochester England ME24DZ United Kingdom |
28/05/2020 03:01 PM | 228 | |||||||||||||||||||
Idea, Feasibility, Pre-Engineering, Detailed Engineering, Installation, Commissioning, Handover | Design Brief, Benefit Schedule & Risk Register, Basic Flow Diagrams, Basic AutoCAD Layouts, Basic Validate and Verify the Project Benefits, Return on Investment Cost Summary spreadsheet & Business Idea Summary (+/- 50%), Complete Idea Stage Design Review Checklist | Flow Diagram Development : Flow Diagrams or Basic Process & Instrumentation Diagrams, Layout Development : Basic AutoCAD Layouts, Benefit Idenification : Validate and Verify the Project Benefits, Investment Breakdown : Equipment & Utilities Cost Estimates & List of Suppliers, Basic Delivery Plan : Basic Timeline and Delivery Plan |
Pre-Engineering Study : Detailed Design Brief, Risk Register : Develop Risk Register, Maintance Prevention Workshop : Carryout and Document MP Workshop findings e.g. problem solving, sequence interviews, Tagging, FMEA, 3G, CEDAC, Reverse Engineer : Reverse Engineer existing system/process to able the development of a Design Brief, Layout Development : General 3D Layouts of the Equipment Positions; Layout Drawings, Basic Drawings : Develop basic drawings for the RFQ's, e.g. fabrication, cable layouts, platforms, guards…., Basic Schedules : Develop basic Schedules for the RFQ's, e.g. equipment, pipeline, instrumentation, valves, MCC, …, Equipment RFQs : Develop Request For Quotations for Equipment Suppliers (Basic), Mechanical & Piping Technical Scope : Develop Request For Quotations for Mechanical, Fabrication, Pipework & Installation Requirements (Basic), Project Delivery Plan : Develop Project Delivery Plan; Gant Chart / Excel Spreadsheet |
Roles & Responibility : Develop Roles and Responsibility Plan; Excel Spreadsheet, Work Breakdown Idenification : Detailed Work Packages; Process, Civil & Structural, Mechanical & Piping, Control & Automation, Electrical…, Project Delivery Plan : Develop Project Delivery Plan; Gant Chart / Excel Spreadsheet (Engineering to Handover), Process Risk Assessments : Carryout Process Reisk Assessment, e.g. HAZOP, FMEA, What If…, Safety Requirement Specifaction : Detail System Safety Requirement Specification , including Safety Instrument Function, SIL / PL Performance Function, Fixed Guarding : Detail Design Fixed Guarding, Interlock Guarding : Detail Design Interlock Guarding System, Site Standards : Verify site specific standard, detail Site Standard Schedule, Equipment Schedule : Detailed Equipment Schedule, including power requirements, Pipe Line Schedule : Detail Pipe Line Schedule, including material specifcations and Bill of Materials, Valve Schedule : Detailed Valve Schedule, Lifting Operations : Review LOLER Develop Lifing Requirement Scope, Design Reviews : Carryout Design Review Meetings; Details PM Log (Checklist), Structural/Mechiical Design : Detailed Structural Design Drawings (CE & Calculations), Platform Design : Detailed Platform Design Drawings (CE & Calculations), Pipework Design : Detailed installation Layouts and Manfacturing Drawings, Building Utilities : Detail Compressed Air and Water Distribution Requirements |
Construction Design Management : Develop and Issue the Pre-Construction Health and Safety Plan, Installation Plan : Develop and Monitor the Installation Plan, Isolation Plan : Develop Isolation Plan to ensure site safety, Story Boards : Develop key Installation Story Boards on high risk activities, Site Supervision : Deliver on site Supervision fo construction activites |
Commissoning Plan : Develop Commissioning Plan (off line & on line), including deisolation requirments |
Michael Burke | MRB Fabrications Ltd | Heapbridge Bury Greater Manchester BL9 7JQ United Kingdom |
28/05/2020 03:01 PM | 229 | ||||||||||||||||
Idea | New Line handler test | Idea Development: Design Brief, Benefit Schedule & Risk Register , Flow Diagram Development: Basic Flow Diagrams , Layout Development: Basic AutoCAD Layouts , Power Distribution Development: Basic Power Distribution Diagram , Control System Development: Basic Control System User Requirement Specification , Legal Compliance: Overview of the Project Compliance and Regulation review , Benefit Idenification: Basic Validate and Verify the Project Benefits , Disinvestment Requirements: Overview of the Distinvestment and Demolish Schedule , Investment Breakdown: Basic Equipment & Utilities Cost Estimates , Idea Cost Outline: Return on Investment Cost Summary spreadsheet & Business Idea Summary (+/- 50%) , Design Review: Complete Idea Stage Design Review Checklist , Other: Type Text…... |
Warren Edmond | EDT Design and Tech Ltd | Prestwich Manchester Greater Manchester M25 10fa United Kingdom |
01/12/2020 03:07 PM | 368 | ||||||||||||||||||||
Idea, Feasibility, Pre-Engineering, Detailed Engineering, Purchasing, Installation, Commissioning, Handover, R&D Tax Relief | newline | Idea Development: Design Brief, Benefit Schedule & Risk Register , Flow Diagram Development: Basic Flow Diagrams , Layout Development: Basic AutoCAD Layouts , Power Distribution Development: Basic Power Distribution Diagram , Control System Development: Basic Control System User Requirement Specification , Legal Compliance: Overview of the Project Compliance and Regulation review , Benefit Idenification: Basic Validate and Verify the Project Benefits , Disinvestment Requirements: Overview of the Distinvestment and Demolish Schedule , Investment Breakdown: Basic Equipment & Utilities Cost Estimates , Idea Cost Outline: Return on Investment Cost Summary spreadsheet & Business Idea Summary (+/- 50%) , Design Review: Complete Idea Stage Design Review Checklist , Other: Type Text…... |
Feasibility Study : Design Brief, Benefit Schedule & Risk Register, Flow Diagram Development : Flow Diagrams or Basic Process & Instrumentation Diagrams, Control System Development : Control System User Requirement Specification, Legal Compliance : Project Compliance and Regulation review, Investment Breakdown : Equipment & Utilities Cost Estimates & List of Suppliers, Basic Delivery Plan : Basic Timeline and Delivery Plan |
Risk Register : Develop Risk Register, Process Diagram Development : Basic Process & Instrumentation Diagrams |
Chemical Compatabillity : Detial assessment on the chemical compatibilie of materials used, Instrumentation Schedule : Detailed Instrumentation Schedule, including sizing |
Equipment RFQs : Develop Request For Quotations for Equipment Suppliers, Electrical RFQs : Develop Request For Quotations for Electrical & Installation Requirements |
Outage Plan : Develop Detail Activities During Outage Plan |
Commissoning Plan : Develop Commissioning Plan (off line & on line), including deisolation requirments |
CE Mark Assessment : Complete CE Mark Risk Assessment and GAP analysis Report, PUWER Assessment : Complete PUWER Risk Assessment and GAP analysis Report |
Manufacturing, Packaging | test2 Edmond | EDT Design and Tech Ltd | Prestwich Manchester Greater Manchester dfgdf United Kingdom |
01/12/2020 03:15 PM | 369 | ||||||||||||
Idea | newline2 | Idea Development: Design Brief, Benefit Schedule & Risk Register , Flow Diagram Development: Basic Flow Diagrams , Layout Development: Basic AutoCAD Layouts , Power Distribution Development: Basic Power Distribution Diagram , Control System Development: Basic Control System User Requirement Specification , Legal Compliance: Overview of the Project Compliance and Regulation review , Benefit Idenification: Basic Validate and Verify the Project Benefits , Disinvestment Requirements: Overview of the Distinvestment and Demolish Schedule , Investment Breakdown: Basic Equipment & Utilities Cost Estimates , Idea Cost Outline: Return on Investment Cost Summary spreadsheet & Business Idea Summary (+/- 50%) , Design Review: Complete Idea Stage Design Review Checklist , Other: Type Text…... |
Warren Edmond | EDT Design and Tech Ltd | Prestwich Manchester Please select M25 1GA United Kingdom |
01/12/2020 03:20 PM | 370 | ||||||||||||||||||||
Idea, Feasibility, Commissioning | test work package creation | Idea Development: Design Brief, Benefit Schedule & Risk Register , Legal Compliance: Overview of the Project Compliance and Regulation review , Design Review: Complete Idea Stage Design Review Checklist , Other: Type Text…... |
sdfsdf | Feasibility Study : Design Brief, Benefit Schedule & Risk Register, Basic Delivery Plan : Basic Timeline and Delivery Plan |
Commissoning Plan : Develop Commissioning Plan (off line & on line), including deisolation requirments |
Warren Edmond | EDT Design and Tech Ltd | Prestwich Manchester Please select M25 1GA United Kingdom |
03/12/2020 11:36 AM | 374 | |||||||||||||||||
Idea, Installation | Idea Development: Design Brief, Benefit Schedule & Risk Register |
Construction Design Management : Develop and Issue the Pre-Construction Health and Safety Plan |
Warren Edmond | EDT Design and Tech Ltd | Prestwich Manchester Please select M25 1GA United Kingdom |
03/12/2020 11:37 AM | 375 | ||||||||||||||||||||
Idea, Feasibility | Idea Development: Design Brief, Benefit Schedule & Risk Register , Layout Development: Basic AutoCAD Layouts , Control System Development: Basic Control System User Requirement Specification , Benefit Idenification: Basic Validate and Verify the Project Benefits |
Feasibility Study : Design Brief, Benefit Schedule & Risk Register, Control System Development : Control System User Requirement Specification |
Warren Edmond | EDT Design and Tech Ltd | Prestwich Manchester Please select M25 1GA United Kingdom |
03/12/2020 11:39 AM | 376 | ||||||||||||||||||||
Idea, Feasibility, Pre-Engineering, Detailed Engineering, Purchasing, Installation, Commissioning, Handover, R&D Tax Relief | gen comms | Idea Development: Design Brief, Benefit Schedule & Risk Register |
Feasibility Study : Design Brief, Benefit Schedule & Risk Register |
Pre-Engineering Study : Detailed Design Brief, Basic Schedules : Develop basic Schedules for the RFQ's, e.g. equipment, pipeline, instrumentation, valves, MCC, …, Power Distribution : Power Distribution Diagram; equipment MCC & Utility Requirements |
Risk Register : Develop Risk Register, Instrumentation Schedule : Detailed Instrumentation Schedule, including sizing, Design Reviews : Carryout Design Review Meetings; Details PM Log (Checklist) |
Control & Automation RFQs : Develop Request For Quotations for Control & Automation & Installation Requirements, Electrical RFQs : Develop Request For Quotations for Electrical & Installation Requirements |
Construction Design Management : Develop and Issue the Pre-Construction Health and Safety Plan, Outage Plan : Develop Detail Activities During Outage Plan |
Commissoning Plan : Develop Commissioning Plan (off line & on line), including deisolation requirments, Other : Type Text... |
dfg | CE Mark Assessment : Complete CE Mark Risk Assessment and GAP analysis Report, Manuals : Review and Develop site Specific O&M manuals, Benefit Validation : Validate and Verify the Project Benefits |
Agriculture, Software | ma Edmond | Prestwich Manchester Greater Manchester M25 1GA United Kingdom |
03/12/2020 12:14 PM | 377 | ||||||||||||
Idea, Feasibility, Pre-Engineering, Detailed Engineering, Purchasing, Installation, Commissioning, Handover, R&D Tax Relief | gen comments | Idea Development: Design Brief, Benefit Schedule & Risk Register , Layout Development: Basic AutoCAD Layouts , Control System Development: Basic Control System User Requirement Specification , Idea Cost Outline: Return on Investment Cost Summary spreadsheet & Business Idea Summary (+/- 50%) |
Feasibility Study : Design Brief, Benefit Schedule & Risk Register, Investment Breakdown : Equipment & Utilities Cost Estimates & List of Suppliers, Basic Delivery Plan : Basic Timeline and Delivery Plan |
Reverse Engineer : Reverse Engineer existing system/process to able the development of a Design Brief, Electrical Technical Scope : Develop Request For Quotations for Electrical & Installation Requirements (Basic) |
Pipe Line Schedule : Detail Pipe Line Schedule, including material specifcations and Bill of Materials |
Control & Automation RFQs : Develop Request For Quotations for Control & Automation & Installation Requirements |
Isolation Plan : Develop Isolation Plan to ensure site safety |
Commissoning Plan : Develop Commissioning Plan (off line & on line), including deisolation requirments |
Asset Care : Develop Asset Structure (item identification), Planned Preventive Maintenance (PPMs) |
Agriculture | Warren Edmond | EDT Design and Tech Ltd | Prestwich Manchester Please select M25 1GA United Kingdom |
03/12/2020 12:34 PM | 378 |
Non Disclosure
One-way Non-Disclosure Agreement
Date: %datecreated%
Parties: %name% and ECAD Services Ltd
%name% of %address%
OR
%company%, a company registered in [England] under company number [number on Register of Companies] whose registered office is at [address of office on the Register of Companies]
(the Recipient)
and
ECAD Services Ltd, a company registered in [England] under company number 06068668 whose registered office is at 10 Meadows Drive, Rossendale, Lancashire, BB4 8FF
(the Discloser)
1.The Discloser intends to disclose information (the Confidential Information) to the Recipient for the purpose of [insert details e.g. discussing the possibility of the Recipient and the Discloser entering into a joint venture] (the Purpose).
2.The Recipient undertakes not to use the Confidential Information for any purpose except the Purpose, without first obtaining the written agreement of the Discloser.
3.The Recipient undertakes to keep the Confidential Information secure and not to disclose it to any third party [except to its employees [and professional advisers] who need to know the same for the Purpose, who know they owe a duty of confidence to the Discloser and who are bound by obligations equivalent to those in clause 2 above and this clause 3.
4.The undertakings in clauses 2 and 3 above apply to all of the information disclosed by the Discloser to the Recipient, regardless of the way or form in which it is disclosed or recorded but they do not apply to:
a)any information which is or in future comes into the public domain (unless as a result of the breach of this Agreement); or
b)any information which is already known to the Recipient and which was not subject to any obligation of confidence before it was disclosed to the Recipient by the Discloser.
5.Nothing in this Agreement will prevent the Recipient from making any disclosure of the Confidential Information required by law or by any competent authority.
6.The Recipient will, on request from the Discloser, return all copies and records of the Confidential Information to the Discloser and will not retain any copies or records of the Confidential Information.
7.Neither this Agreement nor the supply of any information grants the Recipient any licence, interest or right in respect of any intellectual property rights of the Discloser except the right to copy the Confidential Information solely for the Purpose.
8.The undertakings in clauses 2 and 3 will continue in force [indefinitely.] [for [insert number] years from the date of this Agreement.]
9.This Agreement is governed by, and is to be construed in accordance with, English law. The English Courts will have non-exclusive jurisdiction to deal with any dispute which has arisen or may arise out of, or in connection with, this Agreement.
If the Recipient is an individual
Signed and Delivered as a Deed by:
%name% in the presence of:
_____________________________
Signature
_____________________________
Signature of witness
_____________________________
Name of witness
_____________________________
_____________________________
_____________________________
Address of witness
If the Recipient is a company
Executed and Delivered as a Deed by
[name of Recipient] acting by
%name%, a director,
in the presence of:
_____________________________
Signature of Director
_____________________________
Signature of witness
_____________________________
Name of witness
_____________________________
Address of witness
_______________________________________________________________________________________
Email: %email%
Company: %company%
Phone: %phone%
Adress:
%address%
Job Role:
%jobrole%
Management:
%management%
Engineering Skills:
%engineeringskills%
Site Labour:
%sitelabour%
Training:
%training%
Industrial Experience:
%industrialexperience%
Per Hour Value:
%perhourvalue%
perhourvalue1:
%perhourvalue1%
Per Package Value:
%perpackagevalue%
perpackagevalue1:
%perpackagevalue1%
Experience:
%experience%
Idea:
%idea%, %ideaother%
Feasibility:
%feasibility%
Pre Engineering:
%preengineering%
Detailed Engineering:
%detailedengineering%
Purchasing:
%purchasing%
Installation:
%installation%
Commissioning:
%commissioning%
Handover:
%handover%
Availability:
%availability%
Duration:
%duration%
Employment:
%employment%
Number of Employees:
%numberofemployees%
Travel Distance:
%traveldistance%
Business Requirements:
%businessrequirements%
Software:
%software%
General Comments:
%generalcomments%
Submission Date: %datecreated%
ID:%id%