Idea, Feasibility, Pre-Engineering, Detailed Engineering, Purchasing, Installation, Commissioning, Handover, R&D Tax Relief
£60,000,000.00
Additional information
Idea, Feasibility, Pre-Engineering, Detailed Engineering, Purchasing, Installation, Commissioning, Handover, R&D Tax Relief
gen comments
Idea Development, Layout Development, Control System Development, Idea Cost Outline
Feasibility Study :
Design Brief, Benefit Schedule & Risk Register, Investment Breakdown :
Equipment & Utilities Cost Estimates & List of Suppliers, Basic Delivery Plan :
Basic Timeline and Delivery Plan
Reverse Engineer :
Reverse Engineer existing system/process to able the development of a Design Brief, Electrical Technical Scope :
Develop Request For Quotations for Electrical & Installation Requirements (Basic)
Pipe Line Schedule :
Detail Pipe Line Schedule, including material specifcations and Bill of Materials
Control & Automation RFQs
Isolation Plan
Commissoning Plan
Asset Care
Agriculture