Idea | Idea Development: Design Brief, Benefit Schedule & Risk Register , Layout Development: Basic AutoCAD Layouts , Control System Development: Basic Control System User Requirement Specification , Idea Cost Outline: Return on Investment Cost Summary spreadsheet & Business Idea Summary (+/- 50%) |
Feasibility | Feasibility |
Pre-Engineering | Pre-Engineering |
Detailed Engineering | Detailed Engineering |
Purchasing | Purchasing |
Installation | Installation |
Commissioning | Commissioning |
Handover | Handover |
Idea Development | Idea Development: Design Brief, Benefit Schedule & Risk Register |
Flow Diagram Development | |
Layout Development | Layout Development: Basic AutoCAD Layouts |
Power Distribution Development | |
Control System Development | Control System Development: Basic Control System User Requirement Specification |
Legal Compliance | |
Benefit Idenification | |
Disinvestment Requirements | |
Investment Breakdown | |
Idea Cost Outline | Idea Cost Outline: Return on Investment Cost Summary spreadsheet & Business Idea Summary (+/- 50%) |
Design Review | |
Other |