Name (First) |
Robert |
Name (Last) |
Siwerski |
Email |
robert@biasol.com |
Company |
Biasol Ltd |
Phone |
07495774780 |
General Location |
|
Address (Street Address) |
{Address (Street Address):30.1} |
Address (Address Line 2) |
{Address (Address Line 2):30.2} |
Address (City) |
{Address (City):30.3} |
Address (County / State) |
{Address (County / State):30.4} |
Address (ZIP / Postal Code) |
{Address (ZIP / Postal Code):30.5} |
Address (Country) |
{Address (Country):30.6} |
Job Role |
Construction Manager, Contracts Manager, Project Manager, Mechanical Engineer, Process Engineer, Project Engineer |
Management |
Construction, Contracts, Maintenance, Project, Supervision |
Engineering Skills |
Automation, Chemical, Mechanical, Process, Project, Purchasing, Safety, Structural |
Site Labour |
|
Training |
Confined Space, Construction, Degree, Industry Experience + 3 Years, Masters, Problem Solving, Safety |
Industrial Experience |
Construction, Food, Pharmaceutical, Pulp Paper |
Hourly Rate |
|
Package Value |
|
Per Package Value |
|
Experience |
|
Idea |
Flow Diagram Development, Layout Development, Design Review |
Feasibility |
Feasibility Study, Flow Diagram Development, Layout Development, Benefit Idenification, Basic Delivery Plan, Feasibility CapEx Assessment, Design Review |
Pre-Engineering |
Pre-Engineering Study, Risk Register, Reverse Engineer, Process Diagram Development, 3D Site Scan, Basic Drawings, Basic Schedules, Control System Development, Equipment RFQs, Mechanical & Piping Technical Scope, Utilities/Services Technical Scope, Ground Survey, Project Delivery Plan, Design Review |
Detailed Engineering |
Roles & Responibility, Project Delivery Plan, Process Diagram Development, Risk Register, ATEX Compliance, Process Mass Balance, Equipment Schedule, Pipe Line Schedule, Valve Schedule, 3D Site Scan, Layout Development, Design Reviews, Structural/Mechiical Design, Pipework Design, Hydraulic Design, Building Services, Building Utilities, Building HVAC |
Purchasing |
Equipment RFQs, Mechanical & Piping RFQs, RFQs Bid Analysis |
Purchasing Other |
|
Installation |
Construction Design Management, Installation Plan, Site Supervision |
Installation Other |
|
Commissoning |
Commissoning Plan |
Commissioning Other |
|
Handover |
CE Mark Assessment, Training, Manuals, Benefit Validation |
Handover Other |
|
Availability |
Flexible |
Duration |
Work Package |
Employment |
Limited |
Travel Distance |
National |
Business Requirements |
|
Software |
|
General Comments |
|