Name (First) David
Name (Last) Banton
Email david.banton@dbes.co.uk
Company dbes
Phone 01159245759
General Location
Address (Street Address) Nottingham
Address (Address Line 2)
Address (City)
Address (County / State) England
Address (ZIP / Postal Code) NG3 5JR
Address (Country) United Kingdom
Job Role Project Manager, Process Engineer, Project Engineer
Management Contracts, Project
Engineering Skills Application, Commissioning, Mechanical, Process, Project
Site Labour
Training Degree
Industrial Experience Food, Minerals, Pulp Paper, Raw Materials, Water Treatment
Hourly Rate
Package Value
Per Package Value
Experience
Idea Idea Development, Flow Diagram Development, Layout Development, Benefit Identification, Investment Breakdown, Design Review
Feasibility Feasibility Study, Flow Diagram Development, Layout Development, Benefit Idenification, Investment Breakdown, Basic Delivery Plan, Feasibility CapEx Assessment, Design Review
Pre-Engineering Pre-Engineering Study, Risk Register, Site Standards, Reverse Engineer, Process Diagram Development, 3D Site Scan, Layout Development, Basic Drawings, Basic Schedules, Control System Development, Equipment RFQs, Mechanical & Piping Technical Scope, Control & Automation Technical Scope, Electrical Technical Scope, Planning Permition, Benefit Validation, Investment Breakdown, Project Delivery Plan, Resource Delivery Plan, CapEx Application, Design Review
Detailed Engineering Project Delivery Plan, Process Diagram Development, Risk Register, Process Risk Assessments, Safety Requirement Specifaction, ATEX Compliance, Interlock Guarding, Site Standards, Equipment Schedule, Pipe Line Schedule, Instrumentation Schedule, Valve Schedule, Motor Schedule, IO Schedule, 3D Site Scan, Layout Development, Lifting Operations, Design Reviews, Structural/Mechiical Design, Pipework Design, Pnuematic Design
Purchasing Finance Tracker, Equipment RFQs, Mechanical & Piping RFQs, RFQs Bid Analysis, Contract Management, Raise Purchase Orders, Change Management, Delivery Tracker
Purchasing Other
Installation Construction Design Management, Installation Plan, Isolation Plan, Story Boards, Site Supervision
Installation Other
Commissoning Commissoning Plan
Commissioning Other
Handover CE Mark Assessment, Training, Asset Care, Manuals, Benefit Validation
Handover Other
Availability Part Time, Flexible
Duration Work Package
Employment Limited
Travel Distance 10, 25
Business Requirements Insurance, Office, PC / Laptop, Hand Tools
Software Microsoft 365, Microsoft Projects, AutoCAD LT, AutoCAD
General Comments familiar with major 3D software systems

Mozilla/5.0 (Macintosh; Intel Mac OS X 10_14_5) AppleWebKit/605.1.15 (KHTML, like Gecko) Version/12.1.1 Safari/605.1.15