Name (First) | David |
Name (Last) | Banton |
david.banton@dbes.co.uk | |
Company | dbes |
Phone | 01159245759 |
General Location | |
Address (Street Address) | Nottingham |
Address (Address Line 2) | |
Address (City) | |
Address (County / State) | England |
Address (ZIP / Postal Code) | NG3 5JR |
Address (Country) | United Kingdom |
Job Role | Project Manager, Process Engineer, Project Engineer |
Management | Contracts, Project |
Engineering Skills | Application, Commissioning, Mechanical, Process, Project |
Site Labour | |
Training | Degree |
Industrial Experience | Food, Minerals, Pulp Paper, Raw Materials, Water Treatment |
Hourly Rate | |
Package Value | |
Per Package Value | |
Experience | |
Idea | Idea Development, Flow Diagram Development, Layout Development, Benefit Identification, Investment Breakdown, Design Review |
Feasibility | Feasibility Study, Flow Diagram Development, Layout Development, Benefit Idenification, Investment Breakdown, Basic Delivery Plan, Feasibility CapEx Assessment, Design Review |
Pre-Engineering | Pre-Engineering Study, Risk Register, Site Standards, Reverse Engineer, Process Diagram Development, 3D Site Scan, Layout Development, Basic Drawings, Basic Schedules, Control System Development, Equipment RFQs, Mechanical & Piping Technical Scope, Control & Automation Technical Scope, Electrical Technical Scope, Planning Permition, Benefit Validation, Investment Breakdown, Project Delivery Plan, Resource Delivery Plan, CapEx Application, Design Review |
Detailed Engineering | Project Delivery Plan, Process Diagram Development, Risk Register, Process Risk Assessments, Safety Requirement Specifaction, ATEX Compliance, Interlock Guarding, Site Standards, Equipment Schedule, Pipe Line Schedule, Instrumentation Schedule, Valve Schedule, Motor Schedule, IO Schedule, 3D Site Scan, Layout Development, Lifting Operations, Design Reviews, Structural/Mechiical Design, Pipework Design, Pnuematic Design |
Purchasing | Finance Tracker, Equipment RFQs, Mechanical & Piping RFQs, RFQs Bid Analysis, Contract Management, Raise Purchase Orders, Change Management, Delivery Tracker |
Purchasing Other | |
Installation | Construction Design Management, Installation Plan, Isolation Plan, Story Boards, Site Supervision |
Installation Other | |
Commissoning | Commissoning Plan |
Commissioning Other | |
Handover | CE Mark Assessment, Training, Asset Care, Manuals, Benefit Validation |
Handover Other | |
Availability | Part Time, Flexible |
Duration | Work Package |
Employment | Limited |
Travel Distance | 10, 25 |
Business Requirements | Insurance, Office, PC / Laptop, Hand Tools |
Software | Microsoft 365, Microsoft Projects, AutoCAD LT, AutoCAD |
General Comments | familiar with major 3D software systems |
Mozilla/5.0 (Macintosh; Intel Mac OS X 10_14_5) AppleWebKit/605.1.15 (KHTML, like Gecko) Version/12.1.1 Safari/605.1.15